| Project
Title: |
Architects Office Remodel
|

|
| Architectural
Firm: |
Derivi Construction and Architecture
|
|
| Project
Title: |
Woodbridge Streetscape Improvements |

|
| Architectural
Firm: |
Derivi Construction and Architecture
|
|
| Project
Title: |
Chocoholics Divine Desserts |

|
| Architectural
Firm: |
Lesovsky Donaldson Architects, LLP
|
| Principal
Architect: |
Michael Donaldson |
| Project
Staff: |
Dory Tucker
Michelle Niblack |
| General
Contractor: |
Ernie Schenone, Jr. |
| Structural Engineer: |
J.H. Lawder, Inc. |
Steel Building
Structural Engineer: |
Mike Smith Engineering |
IOOF Building
Structural Engineer: |
Marr Schaffer and Miyamoto |
| Steel Building Contractor: |
Roland Construction |
| Location: |
Clements, CA |
| Owner: |
Ernie Schenone, Jr. |
|
| Project
Title: |
The Coffee Hut Country Joe’s Drive-thru Coffee Shop |

|
| Architectural
Firm: |
Lesovsky Donaldson Architects, LLP
|
| Principal
Architect: |
Michael Donaldson |
| Project
Staff: |
Jody Bussey |
| General
Contractor: |
Matt McCarty Construction |
| Structural Engineer: |
J.H. Lawder, Inc. |
| Location: |
Clements, CA |
| Owner: |
Gary & Bonnie Cassel |
|
| Project
Title: |
Pressbox at Alex G. Spanos Stadium, Lincoln High School |


|
| Architectural
Firm: |
Lesovsky Donaldson Architects, LLP
|
| Principal
Architect: |
Eric Wohle, A.I.A. |
| Mechanical Engineer: |
Rolfes Engineering |
| General
Contractor: |
Mid- Cal Constructors |
| Structural Engineer: |
Showerman, Hawn & Stone |
| Electrical Engineering: |
HCS Engineering |
| Concrete Contractor: |
Mid- Cal Constructors |
| Construction Superintendent: |
Kevin Collins |
| Mechanical Contractor: |
EMS |
| Electrical Contractor: |
Carr Electric |
| Ornamental Metals: |
Central Valley Fabricators |
| Location: |
Stockton, California |
| Owner: |
A.G. Spanos Companies / Lincoln Unified School District |
|
| Project
Title: |
City of Stockton Teen Center - The Gary and Janice Podesto, Impact Teen Center |

|
| Architectural
Firm: |
Lesovsky Donaldson Architects
|
| Principal
Architect: |
Eric Wohle, A.I.A. |
| Project Staff: |
Jose Ochoa
Albert Fabriquer
Wesley Mitchell |
| Mechanical Engineer: |
Rolfes Engineering |
| General
Contractor: |
SW Allen Construction Incorperated |
| Structural Engineer: |
Showerman, Hawn & Stone |
| Electrical Engineering: |
HCS Engineering |
| Civil Engineering: |
MCR Engineering |
| Construction Superintendent: |
Paul Griffiths |
| Mechanical Contractor: |
Geo. F. Schuler, Inc. |
| Electrical Contractor: |
Con. J. Franke Electric |
| Public Art Component: |
Robert Ellison |
| Construction Manager: |
Kleinfelder, Inc. |
| Structural Steel: |
Valley Machine & Welding, Inc. |
| Location: |
Stockton, California |
| Owner: |
City of Stockton |
|
| Project
Title: |
Piranha Produce |

|
| Architectural
Firm: |
Pacific Design Associates
|
| Architect
of Record: |
Welty Engineering |
| Principal
Architect: |
Donald Phillips AIA |
| Project
Manager: |
Phyllis Martinez |
| Project Staff: |
John Keesey, Keesey Design |
| Summer Intern: |
Catalina Guajrda |
| Design Engineers: |
Welty Engineering, Inc |
| General
Contractor: |
Acme Construction Company, Inc. |
| Subcontractors: |
Don’s Mobile Glass
Acosta & sons
Harold W. Thompson
Teichert Construction
Darrale Patrias Electrical
Morris Supply
DeHart Sheet Metal & Plumbing
Spectrum Specialties
Kent Lathing
Raymond Greet Construction
D.C. Vient, Inc.
Roof Structures
Refrigeration Concepts
Overhead Door of Stockton |
|
| Project
Title: |
Merced College Interdisciplinary Academic Center |

|
| Architectural
Firm: |
Lionakis Beaumont Design Group, Inc.
|
| Location: |
Sacramento,
CA |
|
| Project
Title: |
Park View Elementary School, Ripon Unified School District |


|
| Architectural
Firm: |
Timothy P. Huff and Associates, Inc.
|
| Landscape
Architect: |
Polhemus Enterprises |
| Mechanical Engineer: |
Lencioni Associates, Inc. |
| Structural Engineer: |
Showerman Hawn & Stone, Inc. |
| Electrical Engineering: |
HCS Engineering, Inc. |
| Civil Engineering: |
Benchmark Engineering, Inc. |
| Site Area: |
17.48 acres |
| Building Area: |
43,685 sq ft |
| Student Capacity: |
597 |
| Construction Cost: |
$8,317,000 |
| Sq. Ft. cost: |
$190.00 |
| Completion Date: |
Summer 2005 |
|
| Project
Title: |
Rumsey Rancheria Fire Station No. 25 |

|
| Architectural
Firm: |
RRM Design Group
|
| Comments: |
Now spotlighted on many Casino marketing materials, the attractive Station and its materials blend seamlessly with the rest of the Casino development, fulfilling the aesthetic wishes of the Tribal Council.
Although the Casino development was contentious for neighbors along the highway 160 corridor, the Station incorporated designs to support community activities and groups. The lobby itself represents the tribal council’s community outreach effort, offering a friendly, open, and civic-style gathering space. |
| Location: |
Brooks, CA |
| Owner: |
Cache Creek Casino Resort |
|
| Project
Title: |
The Welch Project |

|
| Architectural
Firm: |
Cooper Kessel Architect
|
| Comments: |
This home, located in Kirkwood, California at an 8000 foot elevation, was designed to accommodate a large extended family as a retreat and to take advantage of the natural alpine beauty of the site. This is a four-story log home with over 6,300 square feet of living space, five bedrooms, seven baths and a two car garage.
Due to its mountain location, the house was designed to withstand severe winter conditions and a 325 psf snow load.
Exterior decks are largely protected from weather with overhangs, allowing year-round use, while expansive windows take advantage of the views provided by the site. |
| Location: |
Kirkwood, California |
|
| Project
Title: |
Whole House Remodel |


|
| Architectural
Firm: |
Thom Torvend and Associates
|
|
|
|
| click
for Awards 2003 | click
for Awards 2001 | click for
Awards 1999 |
|
|